StatusClosed
Duration53m
First seenSep 23, 6:12 AM
Last updateSep 23, 6:52 AM
Location desc.NB JNO
Dispatch log
- Sep 23 2026 6:28AM[13] [Notification] [CHP]-PER BRIDGE OPERATOR, NEG VISUAL ON PED.
- Sep 23 2026 6:24AM[10] 112-90 CONTACTED RP GOING TO BE 3 MILE SLOUGH BRIDGE / CONTACT CT BRIDGE OPERATOR TO SEE IF PED STILL THERE
- Sep 23 2026 6:12AM[8] 112-90 CPZ ETA 45-1HR
- Sep 23 2026 6:09AM[6] CORR POSS THREE MILE SLOUGH BRIDGE
- Sep 23 2026 6:06AM[3] NEG VEH IN AREA
- Sep 23 2026 6:05AM[2] CORR SHERMAN ISLAND BRIDGE
Units
- Sep 23 2026 6:19AMUnit Assigned
CHP incident #260923SA0118 · What do these codes mean?